This is the most anticipated construction project in Cannes in decades. After years of preparation, the Croisette is undergoing a metamorphosis: new red granite paving, more trees, a cycle path, the Théâtre de la Mer… Until the end of 2028, the most famous boulevard on the French Riviera is reinventing itself, without ever closing. Here's what you need to know, in pictures, and what this means for owners, buyers, and investors.

A project signed by big names
The project was selected following an international architecture competition launched by the City, and unveiled on September 23, 2022. It is signed by the Roland Castro Urban Planning Workshop and the Snøhetta agency, which is notably responsible for Times Square in New York, the Thessaloniki seafront and the Oslo Opera House.
The aim is to enhance the Croisette without betraying its identity, by improving its aesthetics, safety, lighting, and greenery, and by giving more space to pedestrians. The City clarifies that all heritage elements will be preserved , and the famous blue chairs will remain on the promenade.

What will change, in pictures
A red granite floor, the color of Estérel
The new paving, in red granite reminiscent of the Estérel and Suquet areas, will unify the roadway, cycle path, and promenade. Art Deco-inspired paving patterns will highlight the luxury hotels, beach access points, and the Palais des Festivals.




A wider and safer promenade
The north sidewalk will be slightly widened, and pedestrian crossings in front of luxury hotels and major facilities will be significantly widened and raised. A 3-meter-wide two-way cycle path will connect the Palais des Festivals to the Roseraie, ensuring a continuous 3.1 km route to Palm Beach , extending to the existing network.


More trees and "signature" benches
The existing trees, which are part of the city's green heritage, will be preserved and the vegetation expanded with Mediterranean species. According to the published contracts, the Croisette will eventually have 692 trees planted directly in the ground, 295 more than before , irrigated with groundwater from the Lamy parking garage rather than drinking water. Benches designed specifically for the project will also serve as protection against ramming vehicles.


The Theatre of the Sea and the Mirror of the Palace
At the tip of Zamenhof beach, the Théâtre de la Mer will offer a new cultural and event venue, with tiered seating plunging into the Mediterranean Sea, facing the sunset over the Estérel mountains. At the foot of the Palais des Festivals, a body of water, the Miroir, will reflect the Palais and its famous steps.





Find the entire project and official visuals on the City of Cannes website .
A construction project carried out in two phases, without closing the boulevard.
Originally planned for 2024, the works were postponed following a new competitive bidding process. They will begin in the fall of 2026, initially between Rue Macé and Boulevard Alexandre III, with four simultaneous work zones and traffic maintained throughout the project. The construction site is closed every May for the Festival.

This visible construction site is the final stage of a renovation carried out "in layers" since 2017: beaches enlarged, seaside establishments rebuilt, water networks renewed, then a thalassothermal network under part of the boulevard.

Buying on the Croisette during the renovations is like buying the Croisette of 2029 at today's prices.
Winsome Immobilier
What the construction project changes for real estate
The Boulevard de la Croisette is already the most expensive address in Cannes, with average prices exceeding €11,600 per square meter (see our article on real estate prices in Cannes ). A beautified seafront, greener and more pleasant to live in, further enhances the appeal of properties located on the Croisette and the streets leading to it.
In the short term, the construction project brings its share of disruptions: noise, altered access, and more difficult parking in some areas. Some owners will prefer to sell during this period, which could create negotiation opportunities for buyers who envision themselves living on the Croisette of tomorrow.

For vacation rentals, hotels, beaches, and major events remain accessible, and construction is paused during the Festival. Just remember to inform your guests (see also our article on vacation rentals in Cannes in 2026 ).
692
trees planted in the ground after construction
3.1 km
continuous bike path all the way to Palm Beach
2028
announced end of surface works
Our advice
- Buyers: look beyond the construction barriers. You are buying for years to come, not for months of work.
- Sellers: focus on the project. The city's visuals help your buyers envision themselves living there; we integrate them into your property presentation.
- Seasonal landlords: inform your guests. Access, parking, and areas under construction: transparency avoids unpleasant surprises.
- Investors: also consider the adjacent streets. They will benefit from the beautification of the seafront, often at more affordable prices.

Winsome Immobilier is here to help.
Located in the heart of Cannes, our real estate agents closely monitor the city's major projects and their impact on each neighborhood. Are you considering buying, selling, or renting a property on the Croisette or nearby? Let's talk.
Sources: City of Cannes, “The Croisette Reinvents Its Legend – Presentation of the Winning Project”; La Clé Publique, “In Cannes, Rebuilding the Croisette Without Closing It,” September 9, 2026 (BOAMP public procurement notices). Project visuals: project images subject to change, provisional documents © A'U Roland Castro & Snøhetta / MIR – City of Cannes. Timeline and figures subject to change. This article is for informational purposes only.



